skip to main | skip to sidebar

sarrah mae

Friday, June 13, 2008

so far part two: jobs


Posted by Sarrah Mae de los Santos at 9:28 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Links

  • arch1201-2009
    CRIT SCHEDULE PROFESSOR XING RUAN WEEK 12 03 JUNE 2009
    17 years ago
  • Sandra Loeschke

Design Studio

  • ►  2009 (14)
    • ►  June (5)
    • ►  May (6)
    • ►  April (1)
    • ►  March (2)
  • ▼  2008 (74)
    • ►  October (3)
    • ►  September (2)
    • ►  August (3)
    • ▼  June (22)
      • SketchUp model link - elevators and furniture
      • Studio attendance
      • FINAL UT environment
      • UT MAP FINAL
      • UT MAP DRAFT 3
      • UT MAP DRAFT 2
      • UT MAP DRAFT 1
      • Final Lighting and Texture
      • Texture tests
      • more rearranging
      • Elevators
      • some rearranging
      • Spaces - no lighting
      • Versace space interior - no lighting
      • Floating bridge with texture applied
      • Naked interiors - no lighting added
      • the floating bridge
      • jobs and versace's space with no bridge
      • skinless versace space WITH stairs
      • so far part three: versace
      • so far part two: jobs
      • so far
    • ►  May (17)
    • ►  April (21)
    • ►  March (6)

About Me

View my complete profile